Automatic EVA Laminating Line

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2019-10-25 09:19

  • Browse the number:

    316

Send an inquiries
+
Sager Technology Co., Ltd
Contactaixin:

Contactaixin:

saizhe(Mr.)  

Email:

telephone:

phone:

Area:

Beijing

Address:

No. 39, Planning 3rd Road, Industrial Zone, Lisui Town, Shunyi District, Beijing.

Website:

http://www.sagermachinery.com/ http://saizhe.chinaqdmyi.com/

+

1. Description &Technical Reference

Automatic EVA laminating line has been designed and engineered specifically for the laminating of flat and tempered glass with EVA film, which is a professional production line able to produce kinds of laminated glass. It includes Automatic Loading & transport table, Glass Washing Machine, Automatic Positioning Conveyor, Automatic Walking Suction Hanger, Film holder, EVA laminating furnace and unloading table.


2. Parameter

Max. Glass size

3700*2500mm

Floor

5

Max. Glass thickness

40mm

Min. Glass thickness

3+3mm

Heating temperature

0-150℃

Voltage

Can be designed on our requirement


3. Laminated glass

It's a great Automatic EVA laminating line to make laminated glass by EVA / TPU / SGP film, you can insert , silk, paper, PET film, PDLC film, LED line etc.


4. EVA film

We also can offer you the EVA film in various of models with different colors and function. You can used them indoor or outdoor building.


5. FAQ

1. Are you the manufacturer for Automatic EVA laminating line?

Yes, we are the professional factory for process laminated glass with more than 10 years.


2. How about the Max. Glass thickness you oven can do?

Max. Glass thickness can reach to 40mm.


3. Whether your oven can do the bending glass lamination? 

Yes, we can do it well.


4. What is the delivery time?

Usually we need about 3 months to produce this line. We also can help do you the transportation if you need.

http://www.sagermachinery.com/