C Turf Type Landscape Turf

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2019-05-15 21:45

  • Browse the number:

    486

Send an inquiries
+
Shenzhen Wanyuan Industries Co. Ltd
Contactaixin:

Contactaixin:

wanyuan(Ms.)  

telephone:

Area:

Beijing

Address:

No. 22 Wanyuan Bldg., Hongli West Road, Shenzhen, Guangdong, China (518028)

Website:

http://wanyuan.chinaqdmyi.com/

+


Paving process


Supply Ability

Supply Ability:

30000 Square Meter/Square Meters per Day garden artificla grass turf


Name

C TURF

Type

Tufted synthetic grass

Material

PE Monofilament straight & PP Monofilament curled (UV stabilised)

Yarn Type

9000 Dtex PE Monofilament Straight & PP monofilament curled

Yarn Quality

Environmmentaly friendly Free of Lead and cadmium

Primary Backing

100% PP black with fleece UV stabilised

Secondary Backing

Black Latex compound with SBRwith drainage holes

Water Permeability

60 litres/min/m2

Pile Height

40mm

Tuft Gauge

3/8gauge

Stitches per 10Cm Linear

18

Stitches Per M2

18900

Colour

Four Color

UV stability

meets DIN 53387 standard (6000 hours)

Colour fastness

Xenon test Blue scale >7 grey scale>4

Roll Width

4meters

Roll Length

25 meters

Application

Gardens and landscaping

Yarn SHAPE

c


Packaging & Delivery

Packaging Details

packed in rolls with PP bag.

Port : shanghai

Lead Time : 5-15days according to order quantity


Prepare and test the base ground: Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes, making sure the foundation is qualified for installing artificial grass.

Measuring line: Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition.

Palletising turf roll: According to drawing, position the turf rolls on the exact places along the touchline.

Cutting the edge: Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for installation.

Cutting white line: Measure and re-position the white line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts.

Infill rubber granules: After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.

Brushing: to brush the grass in the vertical and horizontal one time by the grass-brushing machine

Check and Acceptance: Inspect the entire finished lawn as per concerned standards and requirement. If any defects found, correct it.


Acceptance: cooperate to check and accept

● 1.Lay turf onto base and position where needed. Using a carpet knife/razor knife, cut off the excess turf on the backside (3 stitches in from sides). Cut turf (on backside) to fit area.

● 2.Fasten one end with 40D or 60D Bright Common nails of 5-6 inches in length, spaced 3-4 inches apart along the edges. Stretch turf and fasten with nails as you move across to the opposite end. Place a nail every 12-24 inches throughout the center and every 3-4 inches along the perimeter

● 3.Fasten together seams by using 11 gauge 6"x1"x6" staples spaced 4 inches apart along the seam. Do not countersink staples.

Note: Be sure the seams are taut and precise, the grain of the turf is facing in the same direction, and the space at the seam is the same as the stitching gauge.

● 4.After turf is installed, power broom before applying infill. Apply infill onto turf using a drop spreader. Spread infill as evenly as possible with a grading rake or broom until infill settles into the base of the turf.
Note: Never use regular sand for infill.

● 5.Hand or power broom again so that the blades are standing straight up. Use carpet scissors to trim off the excessive turf blades. Clean the surrounding area with a blower or a broom.


http://www.windygrass.com/