High Speed Full Automatic Carbonated Soft Soda Drink Production Line

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-06 17:16

  • Browse the number:

    140

Send an inquiries
+
Shanghai Jimei Food Machinery Co. Ltd
Contactaixin:

Contactaixin:

shjimei(Ms.)  

telephone:

Area:

Beijing

Address:

Room 1110,Changhang Mansion, No.800 Zhangyang Rd, Shanghai, Shanghai, China (201801)

Website:

http://shjimei.chinaqdmyi.com/

+
Model Number: csd-1 Brand Name: JIMEI Key Specifications/Special Features: High speed full automatic carbonated soft/soda drink filling machine/production lineProduct descriptionCGF seriesnon-carbonated water bottle 3-in-1 filling machinesapply to the production of mineral water, purified water, flavor water and low alcoholic drinks and moreFilling line include-Water treatment-Blow molding machine- Unscrambler
-Air conveyor
-Rinsing-filling-capping3-in-1 monoblock
-Sleeve/OPP labeler
-Air dryer, visual inspection, ink jet printer
-Shrink wrapper/wrap-round case packer
-Palletizer

Competitive advantage
1.Flexibility
It is easy and quick to change-over to other products or filling temperature, and it is reproducible.

2.Short change-over time
Very short change-over times made possible by the neck-handing parts and filling volume can be adjusted easily by the touch-screen selection or filling program selection.

3.Hygienic bottling conditions
Minimized surfaces on the filler’s exterior thanks to freestanding transfer star wheels. Mechanical drive units such as gears and joint shafts have been replaced by closed servo drives.

4.Easy maintenance
This machine is accessible so that all maintenance and service job can be performed easily.

5.Future viability
The design of the filler enables retrofittingof another capper or the creation of a Bloc with rinser, below moulder, or labeller.
Shipping Information:
  • FOB Port: Shanghai
  • Lead Time: 1 - 45 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe